To catalogue

MICOROX® 23-33F FAST PRIMER

Micorox® 23-33F Fast Primer is 100% solids, 2-part epoxy floor primer/ sealer. It features extremely rapid thin films set even at reduced temperatures. In addition to rapid cure, it provides excellent adhesion and resistance to a wide variety of chemicals.

Product families

Applications

Printing & Packaging — Packaging Coatings
  • Primers & Lacquers

Product Families

Ready-to-Use Products — Paints & Coatings
  • Primers & Sealers

Other characteristics

Brand
MICOROX
Features

Chemical Resistant, Good Adhesion, Rapid Curing Speed; Outstanding adhesion; Deep penetration; Rapid cure

Product Type

2K (2 component) Coating, Epoxy Coating, Primer, Sealer, Solventless & High Solids Coating; 2K (2 component) Coating; Epoxy Coating; Primer; Sealer; Solventless & High Solids Coating

Markets
Printing & Packaging
PACKAGING

23-33 Primer/Sealer is packaged in preproportioned 1 gallon units.

Application
Mix Micorox® 23-33 by combining the entire contents of the Hardener container with that of entire contents of the Resin container. The material should be mixed with a drill and mixing paddle for 2 minutes. The extremely rapid set time of the 23-33 requires immediate application after mixing. The material should be poured onto the surface to be coated then spread with a brush or roller.
Working Life
15-20 Minutes once spread on the floor. (If the material is left in the can, it will gel more rapidly)
Clean Up
Clean up tools immediately after use with hot, soapy water and abrasive pads.
Precaution

Wear protective clothing. Cover hands with vinyl or neoprene gloves. Wear chemical splash goggles. Use only with adequate ventilation.

Technology
Ready-to-Use Products
Hardening and Cure

Micorox® 23-33 hardens for foot traffic in 2.5-3.0 hours at 77°F. Complete cure may require 18-72 hours depending upon temperature.

HIGHLIGHTS

MICOROX® 23-33 is a rapid setting 2 component epoxy primer/sealer used to improve the adhesion of Micorox flooring systems. The primers extremely rapid thin film set time, even at low temperatures, can result in substantial time savings during the priming phase of floor installation.

Surface Preparation

Surface to be coated should be clean and free from oil, grease, wax or any foreign substance. Concrete surfaces should be prepared by mechanical means and/or acid etching.

Temperature Limitations

During the installation and cure, surface temperatures of 60°F-80°Fare recommended. 23-33 may be applied at lower temperatures.

Ready to Use Product Features
  • Chemical Resistant
  • Good Adhesion
  • Rapid Curing Speed

Technical data

Table 1 of 1

11 rows
CharacteristicValueUnitMethod
Density Resin9.26Ibs/gal—
Density Hardener8.88Ibs/gal—
Mixed Density9.16lb/gal—
Mixing Ratio (Resin to Hardner by Weight)100 to 32——
Mixing Ratio (Resin to Hardner by Volume)3 to 1——
Pot Life (77°F)9minutes—
Thin Film Set Time2.5 - 3.0hours—
Tensile Strength10000.0psiASTM D638
Elongation5.0%ASTM D638
Hardness85 - 89Shore DASTM D-2240/Durometer
Bond Strength400.0psi—