To catalogue

Mapefloor I 300 Sl Trp

Mapefloor I 300 SL TRP is a two-component, transparent, non-yellowing epoxy coatings applied at a thickness of 1 mm for finishing coats on epoxy resin systems.

Product families

CASE Ingredients — Resins & Binders
  • Epoxies

Other characteristics

Brand
Mapefloor
End Uses
2K (2 component) Coating, Epoxy Coating
Features

Abrasion Resistance, Alkali Resistance, Chemical Resistance, Non-Yellowing Grade

Compatible Substrates & Surfaces
Concrete
Markets
  • Building & Construction
  • Paints & Coatings
Storage

Mapefloor I 300 SL TRP may be stored for 12 months in its original packaging in a dry place at a temperature of between +5°C and +35°C. The ideal temperature is from +15°C to +20°C.

PACKAGING

18 kg kits: component A = 12 kg; component B = 6 kg.

Consumption

Mapefloor I 300 SL TRP: approx. 1.1 kg/m² to form a 1 mm thick coat.

Coating Type
  • 2K (2 component) Coating
  • Epoxy Coating
Technology
CASE Ingredients
Usage

Mapefloor I 300 SL TRP is used to finish off decorative floors in civil environments subjected to pedestrian traffic such as shops and hotel lobbies. Thanks to its impermeability to liquids and resistance to chemical products and abrasion, Mapefloor I 300 SL TRP may also be used to finish off decorative floors in restaurants, bars, show-rooms, etc.

Recommendations

Do not apply Mapefloor I 300 SL TRP if the temperature is lower than +10°C or higher than +30°C.; Do not go over the surface of Mapefloor I 300 SL TRP with a bubble-breaker.; Do not apply Mapefloor I 300 SL TRP on damp substrates or on substrates with capillary rising damp (please contact our Technical Services Department).; Do not dilute Mapefloor I 300 SL TRP with solvent or water.; Do not apply Mapefloor I 300 SL TRP on dusty or crumbling substrates.; Do not apply Mapefloor I 300 SL TRP on substrates with oil or grease stains or stains in general.; Do not mix partial quantities of the components to avoid mixing errors; the product may not harden correctly.; Do not expose the mixed product to sources of heat.; If rooms where the product is being used need to be warmed up do not use heaters that burn hydrocarbons, otherwise the carbon dioxide and water vapor given off into the air will affect the shine on the finish and ruin its appearance. Use electric heaters only.; Remove aggressive chemicals as soon as possible after they come into contact with Mapefloor I 300 SL TRP.; Use suitable specific cleaning equipment and detergent to clean the product, depending on the type of dirt or stain to be removed.; Protect the product from water for at least 24 hours after application.; The temperature of the substrate must be at least 3°C higher than the dew-point temperature.

Application Methods
Trowel

Technical data

Table 1 of 1

18 rows
CharacteristicValueUnitMethod
Density1.12g/cm3EN ISO 2811-1
Consistencyfluid——
Dry Solid Content100.0%EN ISO 3251
Viscosity (+23°C)800.0mPa•s—
Color of Mix (at +23°C and 50% R.H.)Transparent——
Density of Mix (at +23°C and 50% R.H.)1080.0kg/m3—
Viscocity of Mix (at +23°C and 50% R.H. (rotor F - 5 revs))800-1000Pa.s—
Workability Time (at +20°C)approx. 30minutesEN ISO 9514
Application Temperature5 - 35°C—
Hardening Time (at +23°C and 50% R.H., Dust dry)approx. 6 hours——
Hardening Time (at +23°C and 50% R.H., Set to foot traffic)approx. 24 hours——
Hardening Time (at +23°C and 50% R.H., full)approx. 7 hours——

The Omnichem website uses cookies. By continuing to use the site, you consent to their use in accordance with our Privacy Policy and to the collection of analytics.